Electrical Panel Upgrades
Replace Federal Pioneer, Zinsco, and old fuse panels with modern, safer breaker systems. Fraser Valley homes done with permits, inspections, and zero shortcuts.
- Free Estimates
- Licensed & Insured
- Response Within 24hrs
- 5-Star Google Rating
If your home still has a Federal Pioneer Stab-Lok panel, a Zinsco panel, or fuses instead of breakers, the panel itself is the safety risk, not the wiring. These panels were known to fail to trip during a fault, which is the exact thing that turns a small problem into a fire.
We replace these panels with modern breaker systems from Eaton, Square D, or Siemens, properly bonded and grounded, with arc fault and ground fault protection where the code requires it. We pull the permit, coordinate the BC Hydro disconnect if your panel needs a meter base swap, and have most jobs done in a single day.
Serving electrical panel upgrades in Langley and electrical panel upgrades in Surrey.
Every job includes
- Full panel removal and replacement (Eaton, Square D, or Siemens)
- All circuits relabeled and tested
- AFCI and GFCI breakers installed where code requires (bedrooms, kitchens, bathrooms, exterior)
- New panel cover and clean cable management
- Permit pulled, inspection coordinated, BC Hydro reconnect if needed
- Federal Pioneer, Zinsco, and fuse panel replacements are our specialty
$2,200 to $4,500 typical
Cost varies with circuit count, whether the meter base needs replacement, and whether a service upgrade is bundled. Free written quote with line-item breakdown.
Do you need a permit?
Yes. Every residential panel replacement in BC requires a Technical Safety BC permit. If the meter base or service entrance is touched, BC Hydro must also coordinate the disconnect and reconnect.
Frequently asked
- Federal Pioneer Stab-Lok panels typically have a red FPE label on the inside of the door, sometimes with the words 'Stab-Lok' visible on the breakers themselves. If you are not sure, send us a photo and we will tell you.
- Yes, but usually only for the working day, typically 4 to 8 hours. If you need extended power for medical equipment or a freezer, we can plan a temporary supply.
- No. A panel upgrade replaces the panel itself but keeps the same incoming service amperage (often 100A). A service upgrade increases the amperage from 60A or 100A up to 200A and usually requires BC Hydro coordination. We do both. Many jobs combine the two.
- If you have a Federal Pioneer or Zinsco panel, yes, even if it appears to work. The known failure mode is breakers that do not trip during a fault. If you have a normal breaker panel, an upgrade is only required when you add load that the panel cannot support.
- Many BC insurers now require Federal Pioneer or Zinsco panels to be replaced as a condition of new coverage. If your insurer has flagged your panel, we can write the inspection report after replacement.
You may also need
Read before you decide
Practical articles on electrical panel upgrades — costs, timelines, and what to expect in BC.
- Panel Upgrades
Federal Pioneer Panel Fix in Langley
Federal Pioneer Stab-Lok panels are flagged by BC insurers and known to fail to trip during a fault. Here's what Langley homeowners need to know about replacing them.
Read article - Panel Upgrades
Panel Upgrade Cost in Langley (2026)
What a residential panel upgrade actually costs in Langley Township in 2026, what drives the price up or down, and when bundling with a service upgrade saves money.
Read article - Panel Upgrades
7 Signs You Need a Panel Upgrade
Flickering lights aren't always a panel issue. But Federal Pioneer panels and breakers that won't reset are. Here's how to tell what's actually wrong.
Read article
Electrical Panel Upgrades across the Fraser Valley
We provide electrical panel upgrades across our four primary service areas.
Ready for your electrical panel upgrades?
Send us your project details and photos. We respond within 24 hours.



